1.1 Phase 9 Project of Interprovincial Backbone Transmission Network of China Mobile

☆  Construction unit: China Mobile Communications Corporation

☆  Investment amount: 209.99 million yuan

☆  Duration: July, 2013 -- July, 2014

☆  Main Responsibilities: In shanxi, shaanxi, Inner Mongolia, gansu, xinjiang, qinghai and ningxia, northwest seven provinces (area) province using existing zte wavelength division system adopts the expansion wave IP over its OTN/WDM mode to form a light channel, direct bearing business circuit and SDH/PTN system, in which new Hohhot - datong - taiyuan - xi 'an, shijiazhuang - taiyuan - yinchuan period of 10 g system, new zhangjiakou - Hohhot - yinchuan, Hohhot - datong period of 10 g system, construction of taiyuan - xi 'an - chengdu, xi 'an, lanzhou, wuhan - xi 'an 10 g system, Newly built 10G system of Xian-Lanzhou, Yinchuan-Lanzhou, Lanzhou-Xining, Lanzhou-Urumqi section, 10G system of Lanzhou-Xining - Golmud - Urumqi section, 10G system of Hohhot - Yinchuan-Lanzhou, Yinchuan-Taiyuan section.

☆  Social benefit: Since the completion and operation of the project, each system has been running stably and reliably, meeting the needs of the business networks of China Mobile in Northwest provinces and Tietong Corporation, as well as the channel resources of the redundant part and the grouped circuit resources, with a total bandwidth of about 18.8T. WDM/its OTN and PTN, the use of new technology, new equipment such as SDH, greatly enhanced the western China's ability to cope with a provincial backbone network IP is changed larger particles business, of which 2.5 G or more particle bearing, circuit principle, using WDM/otns priority particles under 2.5 G circuit should adhere to PTN supplemented, SDH bearing, reduces the network construction cost, greatly improve the convenience and flexibility of business configuration, so as to improve the operational efficiency, reduce the operational cost. This project provides a good technical support for the rapid growth of China Mobile's interprovincial high-speed transmission channels and data service traffic, improves the bandwidth utilization of IP service, and creates gratified social and economic benefits.

☆  Technical Highlights of Project Implementation: The regional geological conditions involved in this project are complex and changeable. Most of the stations travel between the mountains and the Qinghai-Tibet Special Line. The highest altitude of the stations along the way is nearly 5000 meters. After winning the bid in June 2013, our company actively organized technical forces to study the project plan and carry out the preparation work. In order to ensure the smooth implementation of the project, the company specially established the Mobile trunk engineering headquarters, which was fully responsible for the real-time communication and coordination with the headquarters of China Mobile Group and the allocation of resources in various provinces, as well as the reasonable allocation of professional and technical personnel, vehicle instruments, etc., and selected the OTN/PTN core technical backbone of the company to form the project research team; The backbone network of this project adopts OTN and PTN equipment from the leading manufacturers of Huawei, ZTE and Fiberhome, and the company's project technical team will work with the manufacturers to overcome difficulties. Through careful organization and planning, the project was successfully completed and accepted in May 2014, lasting 10 months. This project won the National Quality Engineering Award in 2016.

 

1.2 Hubei Mobile Dry Light Transmission Network Phase 15 Equipment Capacity Expansion Project

☆  Construction unit: China Mobile Communications Group Hubei Co., Ltd

☆  Investment Amount: 10,662,900 Yuan

☆  Duration: May 2016 -- May 2017

☆  Main work content: The project is divided into four stages, and the main construction content is as follows.

Phase 15.1: expanded long-distance 100G OTN first plane (northwest ring); Expansion Long Long Relay 100G OTN Biplanar; Expanded the capacity of Fiberhome Xianning Ring, Huawei Tietong Xiaoxihuan and Xiangyang/Shiyan Mobile Tietong interconnection system; Expanded capacity two stem PTN system; New 3G experimental building new machine room, new cabling frame, tail fiber groove, air conditioning, floor and other supporting facilities and room lighting transformation.

15.1 Supplement: Add new Xiaogan Hanchuan, Tianmen North and Jingmen Zhongxiang OLA equipment on the 100G OTN plane of Huawei, and add supporting facilities such as cable frame, floor and ODF frame of Donghu High-tech Transmission Room of network management center.

Phase 15.2: expansion of Huawei 100G OTN plane; 100G OTN west ring two plane; Enlargement of ZTE 100G OTN East Ring Second Plane; Newly built Xianning Ring and Donghu High-tech Wave Segments; Extended capacity long and long relay wave division equipment; New Shiyan Ring OLP protection; A new set of Huawei network management; Enlargement PTN system and SDH system.

Phase 15.3: New West Ring Huawei 100G OTN Third Plane and Wuhan Four-point Ring System; Newly built Huawei 100G OTN first plane direct wave segment equipment from Huanggang second hub to Ezhou; Expansion of Northwest HUAWEI 100G OTN first plane equipment; Xinjian Fiberhouse 100G OTN second plane Xiangyang to Shiyan OLP protection system; Shiyanhuan Huawei 10G WDM plane equipment expansion; New Beacon bearing and collecting customer service PTN plane equipment; Expand the capacity of Huawei's LTE service PTN plane (Xiangyang, Jingzhou, Yichang and Huanggang); New Fiberhome network management system 1 set, used to manage Fiberhome set guest PTN equipment.

☆  Social benefit: The project has increased the transmission bandwidth by 1983G, providing a transmission bearing channel for the rapid growth of the high-speed transmission service and data service of Hubei Mobile. After the project is put into operation, it has played a very good supporting role in the development of broadband IP service, 4G service and other value-added services in Hubei Province. By September 2018, about 98% of the bandwidth of the built equipment has been used, effectively supporting the business development. Hubei Mobile has created gratifying social and economic benefits.

☆  Highlights in technology and management: the project uses new equipment and technologies such as 100G OTN and PTN in technology. In terms of management, the project management platform is used to give full play to the role of engineering construction management in improving the schedule, quality, cost, compliance, safety and other engineering five elements of management. Significantly improve the level and efficiency of engineering construction management for the full implementation of the sustainable development strategy, promote the standardized management of engineering construction, improve the level of engineering construction management, promote advanced scientific engineering construction management methods to provide an excellent engineering construction mode.


8 recordsprev123458next

5G New Infrastructure

1.1 Phase 9 Project of Interprovincial Backbone Transmission Network of China Mobile

☆  Construction unit: China Mobile Communications Corporation

☆  Investment amount: 209.99 million yuan

☆  Duration: July, 2013 -- July, 2014

☆  Main Responsibilities: In shanxi, shaanxi, Inner Mongolia, gansu, xinjiang, qinghai and ningxia, northwest seven provinces (area) province using existing zte wavelength division system adopts the expansion wave IP over its OTN/WDM mode to form a light channel, direct bearing business circuit and SDH/PTN system, in which new Hohhot - datong - taiyuan - xi 'an, shijiazhuang - taiyuan - yinchuan period of 10 g system, new zhangjiakou - Hohhot - yinchuan, Hohhot - datong period of 10 g system, construction of taiyuan - xi 'an - chengdu, xi 'an, lanzhou, wuhan - xi 'an 10 g system, Newly built 10G system of Xian-Lanzhou, Yinchuan-Lanzhou, Lanzhou-Xining, Lanzhou-Urumqi section, 10G system of Lanzhou-Xining - Golmud - Urumqi section, 10G system of Hohhot - Yinchuan-Lanzhou, Yinchuan-Taiyuan section.

☆  Social benefit: Since the completion and operation of the project, each system has been running stably and reliably, meeting the needs of the business networks of China Mobile in Northwest provinces and Tietong Corporation, as well as the channel resources of the redundant part and the grouped circuit resources, with a total bandwidth of about 18.8T. WDM/its OTN and PTN, the use of new technology, new equipment such as SDH, greatly enhanced the western China's ability to cope with a provincial backbone network IP is changed larger particles business, of which 2.5 G or more particle bearing, circuit principle, using WDM/otns priority particles under 2.5 G circuit should adhere to PTN supplemented, SDH bearing, reduces the network construction cost, greatly improve the convenience and flexibility of business configuration, so as to improve the operational efficiency, reduce the operational cost. This project provides a good technical support for the rapid growth of China Mobile's interprovincial high-speed transmission channels and data service traffic, improves the bandwidth utilization of IP service, and creates gratified social and economic benefits.

☆  Technical Highlights of Project Implementation: The regional geological conditions involved in this project are complex and changeable. Most of the stations travel between the mountains and the Qinghai-Tibet Special Line. The highest altitude of the stations along the way is nearly 5000 meters. After winning the bid in June 2013, our company actively organized technical forces to study the project plan and carry out the preparation work. In order to ensure the smooth implementation of the project, the company specially established the Mobile trunk engineering headquarters, which was fully responsible for the real-time communication and coordination with the headquarters of China Mobile Group and the allocation of resources in various provinces, as well as the reasonable allocation of professional and technical personnel, vehicle instruments, etc., and selected the OTN/PTN core technical backbone of the company to form the project research team; The backbone network of this project adopts OTN and PTN equipment from the leading manufacturers of Huawei, ZTE and Fiberhome, and the company's project technical team will work with the manufacturers to overcome difficulties. Through careful organization and planning, the project was successfully completed and accepted in May 2014, lasting 10 months. This project won the National Quality Engineering Award in 2016.

 

1.2 Hubei Mobile Dry Light Transmission Network Phase 15 Equipment Capacity Expansion Project

☆  Construction unit: China Mobile Communications Group Hubei Co., Ltd

☆  Investment Amount: 10,662,900 Yuan

☆  Duration: May 2016 -- May 2017

☆  Main work content: The project is divided into four stages, and the main construction content is as follows.

Phase 15.1: expanded long-distance 100G OTN first plane (northwest ring); Expansion Long Long Relay 100G OTN Biplanar; Expanded the capacity of Fiberhome Xianning Ring, Huawei Tietong Xiaoxihuan and Xiangyang/Shiyan Mobile Tietong interconnection system; Expanded capacity two stem PTN system; New 3G experimental building new machine room, new cabling frame, tail fiber groove, air conditioning, floor and other supporting facilities and room lighting transformation.

15.1 Supplement: Add new Xiaogan Hanchuan, Tianmen North and Jingmen Zhongxiang OLA equipment on the 100G OTN plane of Huawei, and add supporting facilities such as cable frame, floor and ODF frame of Donghu High-tech Transmission Room of network management center.

Phase 15.2: expansion of Huawei 100G OTN plane; 100G OTN west ring two plane; Enlargement of ZTE 100G OTN East Ring Second Plane; Newly built Xianning Ring and Donghu High-tech Wave Segments; Extended capacity long and long relay wave division equipment; New Shiyan Ring OLP protection; A new set of Huawei network management; Enlargement PTN system and SDH system.

Phase 15.3: New West Ring Huawei 100G OTN Third Plane and Wuhan Four-point Ring System; Newly built Huawei 100G OTN first plane direct wave segment equipment from Huanggang second hub to Ezhou; Expansion of Northwest HUAWEI 100G OTN first plane equipment; Xinjian Fiberhouse 100G OTN second plane Xiangyang to Shiyan OLP protection system; Shiyanhuan Huawei 10G WDM plane equipment expansion; New Beacon bearing and collecting customer service PTN plane equipment; Expand the capacity of Huawei's LTE service PTN plane (Xiangyang, Jingzhou, Yichang and Huanggang); New Fiberhome network management system 1 set, used to manage Fiberhome set guest PTN equipment.

☆  Social benefit: The project has increased the transmission bandwidth by 1983G, providing a transmission bearing channel for the rapid growth of the high-speed transmission service and data service of Hubei Mobile. After the project is put into operation, it has played a very good supporting role in the development of broadband IP service, 4G service and other value-added services in Hubei Province. By September 2018, about 98% of the bandwidth of the built equipment has been used, effectively supporting the business development. Hubei Mobile has created gratifying social and economic benefits.

☆  Highlights in technology and management: the project uses new equipment and technologies such as 100G OTN and PTN in technology. In terms of management, the project management platform is used to give full play to the role of engineering construction management in improving the schedule, quality, cost, compliance, safety and other engineering five elements of management. Significantly improve the level and efficiency of engineering construction management for the full implementation of the sustainable development strategy, promote the standardized management of engineering construction, improve the level of engineering construction management, promote advanced scientific engineering construction management methods to provide an excellent engineering construction mode.